25
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
Installing the valve clearance.
- Removal of the storage compartment (see
procedure 1).
- Removal of the central cover panel (see
procedure 3).
- Remove the 4 fixing bolts (1).
- Remove the 2 fixing bolts (2).
- Disconnect the oil vapour return pipe.
Tightening torque: 1 m.daN.
- Remove the rocker cover.
- Remove the timing mark plug (1).
- Installing the valve clearance (Refer to the
workshop manual: 2-valve, 50cc 4-stroke
engine P/N 759517).
Removal of the exhaust system.
- Remove the 2 nuts (1).
- Remove the 2 fixing bolts (2).
- Remove the exhaust.
- Removal of the gasket.
Tightening torque:
Screw 1: 1.5 m.daN.
Screw 2: 2.3 m.daN.
1
2
1
1
2
Summary of Contents for V-CLIC -
Page 1: ...Sales division Technical network leadership WORKSHOP MANUAL ...
Page 35: ......
Page 36: ......
Page 37: ......