
Appendix B. Battery Back up Module
39
Operation
Battery conditioning is automatic. There are no manual procedures for
battery conditioning or preconditioning to be performed by the user.
Battery bad a tendency to “remember” its capacity. In order to make sure of
all the capacity of your battery cells, allow the battery cell to be fully charged
when installed for the first time. The first time charge of battery cells takes
about 24 hours to complete.
Removing the Battery Backup Module
The battery module will need to be removed for one of the following reason:
Disconnect battery module if there is a long storage period before
deployment
The LI-ION battery will no longer accept a charge properly.