TDP018
Page 2 / 12
Perrot REGNERBAU CALW GmbH
Industriestraße 19-27 / D-75382 Althengstett / Germany
Telefon : 0049-7051-162-0 / Fax : 0049-7051-162–133
E-mail : [email protected]
/ E-mail Konstruktion : [email protected]
Contents
1. General
2. Safety
3. Description
4. Assembly
5. Commissioning
6. Maintenance
7. Break-down and elimination of the defects
8. Spare parts list
1. General
We presume, that you are experienced in the field of irrigation. Therefore we have kept this
instruction as brief as possible, and have included such information only, which you must have
for the use of this product.
A guarantee can be accepted only, if the sprinkler has been operated in accordance with these
instructions, and if the defect occurs within the guarantee period.
1.1.
Application
The sprinkler is used for the uniform distribution of the water. The water should be pre-
cleaned, and free of coarse and fibrous impurities.
Max. water temperature will be 50 degree C.
Max. ambient temperature will be 75 degree C.