Check
condition of
brake pads
Minimum
thickness of
2.5mm
On site
Replace as required and retest
(workshop)
Check
Inclinometer
battery
On site
Replace as required. If battery
fitted, check for correct
operation
Maintenance
Task
Instruction
Location
Pass/Fail Criteria
Carried
Out by
Date
Audite
d by
Carry out
Monthly
Maintenance
Worksho
p
Replace any damaged or worn
or incorrectly functioning parts
Test all brakes
using the
Brake Test
Tool
Minimum
torque of
18Nm.
Maximum
torque of
25Nm
Worksho
p
Adjust brakes and/or replace
any damaged, worn or
incorrectly functioning parts
Replace
‘Brake Test
Next Due’
label
Worksho
p
Record date next due in
Maintenance Records
Maintenance
Task
Instruction
Location
Pass/Fail Criteria
Carried
Out by
Date
Audited
by
Carry out
Three Monthly
Maintenance
Workshop
Replace any damaged or worn
or incorrectly functioning parts
Examination
Assemble
trolley to
inspect tower.
Carry out
Visual
inspection
Workshop
No signs of obvious damage or
permanent deformation. No
deformation, cracked welds
and all parts fit together as
intended
Summary of Contents for SCAFFOLD TROLLEY PLUS
Page 1: ...MADE IN ...
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ... ...
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ... ...
Page 27: ... ...
Page 28: ... ...
Page 29: ......
Page 30: ......
Page 31: ......