![Pergola kits USA WOOD GABLE ROOF PAVILION Assembly Manual Download Page 10](http://html1.mh-extra.com/html/pergola-kits-usa/wood-gable-roof-pavilion/wood-gable-roof-pavilion_assembly-manual_1529914010.webp)
Set the roofing sections in place
so the matching numbers
rest against each other. The
roofing sections will all be
marked in the top corner
with numbers.
When all fascia boards are
installed, set the four roof
panels on the outside of the
building. (You might need 3
or 4 helpers for this step.)
31
10
The eaves-side fascia boards will
overlap the gable-sides and will
extend out past them 11" (12" past the
top plate). Align the premarked line
with the end of the gable-side fascia
board ends. Attach the eaves-side
fascia to the top plate just as was done
with the gable-sides. The eaves-side
fascia will need to be connected to the
gable-side fascia boards with 2 1/2"
screws. Follow this process until all
fascia boards are installed.
Next, drive 2 1/2" screws every
16" along the entire length
of the fascia board. Follow
these same steps with the
other gable-side fascia board
as well.
28
29
30