
4
Safety and approvals
● It is a legal requirement that the installa<on of this appliance is in accordance with Local Building Control Approval
and is installed by a qualified/competent person. We strongly recommend that a qualified heating & plumbing engi-
neer carries out this work. HETAS Ltd operate such a scheme and a listing of their competent persons can be found on
their website:
www.hetas.co.uk
.
● The boiler should be located on a level non-combustible surface, with suitable load bearing capacity.
● Allow sufficient room around the boiler for maintenance and cleaning.
● Ensure the customer is presented with this manual following installa<on.
● Ensure the appliance is installed and maintained in accordance with these instruc<ons. Failure to do so may result in
unsafe operation, and will invalidate any guarantee or warranty. The appliance and flue should be inspected and
cleaned annually. More frequent cleaning may be required if unseasoned wood is used. Consult a qualified chimney
sweep or heating engineer if in any doubt.
● Improper use of this appliance can lead to injury or death of the user or third a party. Therefore, ensure the appli-
ance is installed in accordance with this manual and any rules in force. Any faults should be fixed immediately to en-
sure safe operation. The manufacturer accepts no responsibility for improper use and/or installation of this appliance.
This includes maintaining the installation, operation and conditions specified by the manufacturer.
Boiler Location Requirements and Safety Notes.
THESE BOILERS MUST BE INSTALLED IN ACCORDANCE WITH CURRENT BUILDING STANDARDS AND REGULATIONS
AND ANY LOCAL BYE LAWS, BY A SUITABLY QUALIFIED/COMPETENT PERSON.
Summary of Contents for MC 5.20 CI
Page 10: ...10 Assembly Boiler assembly...