Perge MC 5.20 CI Installation And User Instructions Manual Download Page 1

190171- H (122010)

 

INSTALLATION AND USER INSTRUCTIONS

 

M C   S E R I E S   L O G   B O I L E R  

MC 5-20 CI  

5/20 kW.

 

MC 5-30 CI PF 

5/30 kW. 

 

MC 5-30 CI GF 

5/30 kW.   

 

Summary of Contents for MC 5.20 CI

Page 1: ...190171 H 122010 INSTALLATION AND USER INSTRUCTIONS M C S E R I E S L O G B O I L E R MC 5 20 CI 5 20 kW MC 5 30 CI PF 5 30 kW MC 5 30 CI GF 5 30 kW...

Page 2: ...US Boiler Identification 7 Boiler Specification 7 Boiler Appliance Contents 8 Boiler Dimensions 9 ASSEMBLY Boiler Assembly 10 SETUP AND USE Fitting and Calibration of the Thermostat 11 Use and Operati...

Page 3: ...ectrical work should be carried by a qualified electrician in accordance with the latest regulations Before attempting any work on the boiler or system controls ensure the mains supply is disconnected...

Page 4: ...do so may result in unsafe operation and will invalidate any guarantee or warranty The appliance and flue should be inspected and cleaned annually More frequent cleaning may be required if unseasoned...

Page 5: ...imum height of 600mm above the boiler to any bend is required taking into account that each bend will require an additional flue height to be provided Any bend should be no greater that 45 degrees IMP...

Page 6: ...per Chamber 3 designed to maximise efficiency by incorporating a series of water filled tubes through which flue gases pass Anti Boiling Quench Coil 4 to prevent overheating Fuelbed Grate Cleaning Doo...

Page 7: ...Miscellaneous 7 A Data Plate for each boiler is fitted to the top rear of the appliance beneath the top cover This is required when calling regarding a spares or technical enquiry Boiler Specifiation...

Page 8: ...s the main boiler combustion chamber engine unit which is shrink wrapped The following accessories are located within the boiler combustion chamber Box 3 Cardboard box containing the following compone...

Page 9: ...ht location for your boiler Locate your boiler so that you are able to easily access stored wood fuel Ensure there is sufficient access to load and clean the boiler Ensure the boiler is located in a d...

Page 10: ...10 Assembly Boiler assembly...

Page 11: ...C 50 C This can then be progres sively increased Cracking of the combustion chamber ceramic will occur this is normal and will not affected the operation of the boiler Position the control lever so t...

Page 12: ...f ash form the boiler and cleaning of the upper heat tubes and combustion chamber Periodic maintenance Ash removal and upper heat exchanger tube cleaning instruction Ash door rear spigot connection tw...

Reviews: