background image

TTR-10A electromechanical tripod turnstile  

 

Figure 14. Dimensions and installation procedure for the 

MT10.1 

mounting bracket 

b.  Installation procedure for the 

MT10.2

 mounting bracket (

TTR-10AK

 modification) (Fig. 15):  

  Mark and cut the holes in the wall for the anchors to fix the turnstile and cable duct to the 

cable entry area. Use the turnstile bracket as a template to mark the holes if necessary.  

  Use a level to check the horizontal position of the bracket when marking and installing.  

  Pull the cables through the rack and through the corresponding bracket hole. The cable 

outlet from the hole must be at least 30cm long.  

  Use at least four anchor bolts to fix the bracket to the wall. The bracket has eight holes for 

M8 anchor bolts and four holes for M12 anchor bolts.  

 

Note: 

It is not recommended to mount the turnstile on the wall without using a standard 
bracket. In this case, the barrier arms will cling to the mounting surface during rotation or 
abut against it. 

 

Figure 15. Dimensions and layout of holes on the wall for fixing the MT10.2 bracket 

21 

Summary of Contents for TTR-10A Series

Page 1: ...ASSEMBLY AND OPERATION MANUAL TTR 10A Electromechanical tripod turnstile with automatic anti panic arms ...

Page 2: ...Electromechanical tripod turnstile with automatic anti panic arms TTR 10A Assembly and Operation Manual ...

Page 3: ...4 5 4 Additional devices connectable to the turnstile 15 5 4 1 Relay outputs 15 5 4 2 Intrusion detector and siren 16 5 4 3 Remote indicators 16 5 5 Operation contingencies and response 17 6 MARKING AND PACKAGING 17 7 SAFETY REQUIREMENTS 18 7 1 Installation safety requirements 18 7 2 Operation safety requirements 18 8 INSTALLATION INSTRUCTIONS 18 8 1 Installation details 18 8 2 Installation tools ...

Page 4: ...example in vehicles TTR 10AK with MT10 2 bracket for mounting on a vertical surface wall TTR 10AB with MT10 3 mounting post for floor mount The number of turnstiles needed to ensure quick and convenient passageway is recommended to be determined upon calculation of the turnstile throughput rate Sect 3 The manufacturer recommends installing one turnstile according to the 500 people per shift criter...

Page 5: ...0AK modification with MT10 2 bracket assembled 613 806 714 mm TTR 10AB modification with MT10 3 mounting post assembled 1055 806 762 mm Turnstile net weight TTR 10AT TTR 10AK modification max 33 kg TTR 10AB with MT10 3 mounting post assembled max 55 kg Figure 1 Turnstile overall view 4 DELIVERY SET 4 1 Standard delivery set 4 1 1 TTR 10AT modification Package Box 1 Basic equipment Turnstile housin...

Page 6: ...s with spring washers for mounting the hub 3 Anaerobic adhesive sealant for fixing the hub screws 20 ml 1 SW3 Allen key 1 100 mm cable ties 5 M8 nuts 4 Flat washers 8 4 Spring washers 8 4 Technical documentation Certificate 1 Assembly and operation manual 1 4 1 3 TTR 10AB modification Package Box 2 Box 1 includes Basic equipment Turnstile housing and base assembled 1 Hub with barrier arms 1 RC pan...

Page 7: ...nection There are two modes for the turnstile control a pulse control mode and a potential control mode The turnstile mechanism provides automatic barrier arm rotation to the initial position after each pass After the barrier arms are turned 60 or more the reverse rotation is blocked The rotor electric drive provides smooth and silent operation of the turnstile The turnstile is supplied with safe ...

Page 8: ...o the base Inside the base under the housing are located Fig 3 the drive control board 9 interface board 10 and the turnstile mechanism which includes drive 12 assembled with electric motor and position sensor board electromechanical blocking device 14 with optical sensors emergency unblocking device Fire Alarm 11 anti panic function of automatic folding arms 5 2 2 LED indication unit The housing ...

Page 9: ... the interface board in accordance with the connection layout Sect 5 3 1 and Fig 17 5 2 4 Control and interface boards The control board 9 receives commands from the interface board 10 and controls the operation of the electric motor the operation of the blocking device and the emergency unblocking device All nodes of the turnstile mechanism are connected to the control board with internal wiring ...

Page 10: ...nd Led B for the barrier arms rotation in the corresponding direction Pass A and Pass B for the alarm output A1 A2 Alarm and relays the signal about the current status of the intrusion detector DETECT The following devices are connected to the interface board RC panel WRC ACS controller emergency unblocking Fire Alarm device remote display units and other optional equipment Wired connection is mad...

Page 11: ... used during operation must be in the OFF position PWR green LED indicator for interface board power supply Table 1 Pin assignment of connector blocks Legend Assignment Control board connector blocks X1 POWER 1 24 2 GND Turnstile power supply 24V DC 9A Interface board connector blocks X1 ACS 1 12OUT 2 GND 12V power supply for additional equipment siren 3 A1 4 A2 Alarm relay output siren connection...

Page 12: ...ctor of the X2 connector block on the interface board regarding the GND contract A normally closed relay contact or a scheme with an open collector output can serve as a control element In this case all other incoming control commands are ignored Sect 5 3 2 Sending a low level signal to Fire Alarm input you put the turnstile directions into the mode according to the signal levels at the inputs L R...

Page 13: ...CS controller The outputs of the ACS controller are to support potential control mode Control signal duration at sending control command to control inputs is 100ms minimum The passage waiting time is equal to low level signal duration i e if by the moment of passage completion in the permitted direction there s a low level signal on the input of this direction the turnstile remains open in this di...

Page 14: ... command to the control mechanism to block the further passage in this direction while the drive will return the barrier arms back to original position 8 When the barrier arms reach the initial position 120 rotation of the barrier arms or if the passage is denied by 0 the microcontroller enters the standby mode In the Free passage operating modes the algorithm remains the same except the turnstile...

Page 15: ...ile switches to the Fire Alarm emergency free passage mode with all the incoming turnstile control commands ignored The central barrier arm automatically falls down under its own weight and takes up a vertical position ensuring free passage Both green direction arrows will flash briefly changing to a red cross on the turnstile LED indication unit 2 If the Fire Alarm signal is received while making...

Page 16: ...tor contacts DETECT and COM Sect 5 4 2 Battery contacts LV1 and LV2 Sect 5 5 Relays PASS A Pass A and C contacts PASS B Pass B and C contacts Detector and Not ready DETECT READY and COM contacts have normally open contacts when the power is off Moreover the C and COM contacts common to these relays are not connected to the turnstile power supply minus Relays Alarm contacts A1 and A2 and Battery LV...

Page 17: ...en Tables 5 and 6 the DKZP1 input is activated and a signal comes from the intrusion detector the Alarm output is activated The Alarm output is disabled 5 sec after activation or by executing of any received command The signal from the intrusion detector is ignored for the period of authorized unblocking of the turnstile in either or both directions Note The control signal from the intrusion detec...

Page 18: ...ers of the Battery relay output signals are indicated in Sect 5 4 1 In case of a voltage drop below the threshold value for switching off the electronics 17V the turnstile electronics will automatically disconnect from the power source When voltage is restored above the threshold for switching the electronics on 18V the turnstile electronics will automatically turn on 6 MARKING AND PACKAGING The t...

Page 19: ...urnstile It is prohibited Do not use the turnstile under conditions that do not comply with the requirements of Section 2 of this Manual Do not use the turnstile at supply voltage that does not comply with the requirements of Section 3 of the Manual The power supply unit should be used in compliance with its operational documentation 8 INSTALLATION INSTRUCTIONS Follow the safety requirements durin...

Page 20: ...ting points of the turnstile post are in the same horizontal plane control with a level When installing the turnstile post on a less solid base it is necessary to use embedded foundation elements of at least 300 300 300 mm size It is also possible to use a frame base Passage zone organization The turnstile is equipped with an electric drive for the barrier arms rotation When rotated 5 or more the ...

Page 21: ...eness as per Sect 4 2 Install the turnstile power supply to its designated place in accordance with its operational documentation 3 Route all cables in the cable ducts to the turnstile 4 Install the mounting bracket or mounting post Caution It is necessary to correctly determine the turnstile installation height when marking the mounting of the MT10 1 or MT10 2 mounting brackets The recommended tu...

Page 22: ...izontal position of the bracket when marking and installing Pull the cables through the rack and through the corresponding bracket hole The cable outlet from the hole must be at least 30cm long Use at least four anchor bolts to fix the bracket to the wall The bracket has eight holes for M8 anchor bolts and four holes for M12 anchor bolts Note It is not recommended to mount the turnstile on the wal...

Page 23: ...on Fig 16 Detach the post front panel by unscrewing the two bottom screws Mark and make holes in the floor for anchor bolts to secure the post route the cable duct to the cable entry area Marking can also be done directly on the base of the mounting post Route the cables through the cable duct to the entry area the length of cable stock should be at least 1 3 meters 22 ...

Page 24: ...nterface board Fig 17 9 Install and connect optional equipment if necessary intrusion detector and siren Fire Alarm emergency unblocking device remote indicators etc Fig 17 10 Check serviceability and accuracy of all the electrical connections in accordance with the diagram in Fig 17 Slide the interface board back into place and tighten the lock screws Carefully lay and secure all connected cables...

Page 25: ...Run a test switch on of the turnstile Sect 9 1 8 5 Connection layout Table 4 Connection layout description Legend Name Q ty A1 Control board 1 A2 Interface board 1 A3 Drive assembled 1 A3 1 Position sensor board 1 A3 2 Electric drive motor 1 A4 Blocking device optical sensors board 1 A5 LED indication unit 1 A6 Anti panic device electric magnet 1 A7 Blocking device electric magnet 1 A81 Turnstile ...

Page 26: ...TTR 10A electromechanical tripod turnstile Figure 17 Connection layout 25 ...

Page 27: ... sound signal press any button on the RC panel The turnstile is ready for operation 9 2 Operating modes of the turnstile at pulse control mode After switch on the power supply the turnstile is automatically switched to Always locked mode See Table 5 for the turnstile control modes and indication Setting the operating modes for each direction is independent i e setting the operating mode for one di...

Page 28: ...site direction Set the Free passage in the set direction mode for one direction and Single passage in the set direction for the other Both green indicators Left and Right are on Green arrows for both passage directions are on After the passage set for single pass green arrow goes out The turnstile is unlocked for free passage in the set direction In the other direction the turnstile unlocks for a ...

Page 29: ...e passage in both directions LED display shows the green for 1 25 sec and red for 0 25 sec indicators control commands from other devices and software are ignored Sect 5 3 2 The barrier arm is set into vertical position at a power loss as well Caution For urgent evacuation of people from facilities in case of fire natural calamities or other emergencies the additional emergency exit should be prov...

Page 30: ...h Chain and Rope Lube Spray WEICON or another with similar properties spring attachment points points 2 3 4 in Fig 18 with molybdenum grease emergency unblocking mechanism components automatic lowering of the anti panic barrier arm 5 in Fig 18 with Chain and Rope Lube Spray WEICON or another with similar properties 8 Check the reliability of the connector blocks cable connections on the control 9 ...

Page 31: ... in the original package for no less than 24 hours indoors at room temperature Appendix 1 Control signal algorithm at pulse control mode Note For the RC panel Active front pressing of the relevant button on the RC panel Low level the relevant button on the RC panel has been pressed High level the relevant button on the RC panel has not been pressed The command is a signal active front signal trans...

Page 32: ...low level at the contact ST and a high level at the contact L or active front is at the contact ST while there is a low level at the contact R and a high level at contact L At this command the passage direction B opens until the command Always locked is received the status of the passage direction A does not change at that Free passage open for free passage in both directions active front is at th...

Page 33: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com ...

Page 34: ...www perco com ...

Reviews:

Related manuals for TTR-10A Series