8.2 Installation tools 

  1.2  - 1.5 kW hammer drill; 

 

16 mm hard – alloy drill bits for anchor bolt sleeves; 

 

5 mm hard-alloy drill bits for the CU wall mounting dowels; 

  Crosshead screwdriver No. 2 (150 mm); 

  S17, S13 socket wrenches; 

  Plumb-line and level; 

  Measuring tape 3m. 

 

Note: 

It is allowed to use other testing equipment and measuring tools provided the 
equipment in use ensures the required parameters and measurement accuracy.  

8.3 Installation procedure 

 

Attention! 

The manufacturer shall not be liable for any damage caused in the result of 
improper installation and declines any claims arising thereof in case 
if the installation is not in compliance with the instructions provided in this Manual

.  

1.  Unpack the turnstile, check the completeness as per Chapter 4 of this Manual and 

as per Chapter 3 of the Certificate. 

2.  Make the holes for anchor bolt sleeves (16). Mark out the mounting holes in the 

floor for turnstile housing (1) as shown in Fig. 5 , and for the wall mount for the CU 
(3) as shown in Fig. 6. 

3.  Insert anchor bolt sleeves into the holes so that they do not stick out above the floor 

surface. Set up the housing and fix it with the bolts (16). Put the plugs (5) in their 
places.  

4.  If you lay the turnstile cable (7) under the floor surface, make a hole for the turnstile 

cable (7) and for the power supply cable (19) of the heating system with 
thermocontrol (option 1 or 2 in Fig.5) and prepare cable raceways. Fix the housing 
(1) after fitting the cables (7) and (19).  

5. 

Установите

 

стойку

закрепите

 

ее

 

болтами

 (16), 

после

 

чего

 

установите

 

заглушки

 

(5). 

6.  Remove the cover from the hub (11) of the turnstile housing (1), unscrewing the 

central bolt. Unscrew the fixing bolt (18) on the barrier arm (2). Fit the barrier arm 
into the mounting hole on the hub (11) and fasten the barrier arm (2) with the bolt 
(18). Put a spring washer under the bolt head. Repeat the above described 
procedure for fitting up the remaining barrier arms. 

7.  Put the cover onto the hub (11) and fix it with the central bolt. 

 

Note: 

The CU (3) should be placed on a wall so that free access to the toggle switches 
and the convenient observation of the indicators are ensured. 

8.  Prepare holes for the dowels. Fit in the dowels (15). Insert the top screws (17), 

suspend the CU thereon and fix it with the bottom screw (17). 

9.  Connect the RC (4) cable (6) and the cable of the housing (7) to the CU (3). 
10. Connect the power cable of the heating system with thermocontrol (19) to the power 

supply unit (20). The power supply unit (20) of the heating   system with 
thermocontrol should be placed close to the CU. 

11. Once the installation is complete, the turnstile is ready for operation. 

Summary of Contents for TTR-04CW-24

Page 1: ......

Page 2: ...Electromechanical Tripod Turnstile PERCo TTR 04CW 24 Assembly and Operation Manual...

Page 3: ...he turnstile with a mechanical release key 11 6 MARKING AND PACKAGING 12 7 SAFETY REQUIREMENTS 12 7 1 Installation safety requirements 12 7 2 Operation safety requirements 12 8 INSTALLATION INSTRUCTIO...

Page 4: ...outlets railway terminals airports etc To ensure fast and convenient passage it is recommended to install one turnstile per 500 people working the same shift or on the basis of maximum working load 30...

Page 5: ...ontrol unit power cable 1 5 m RC panel cable 3 m Turnstile housing in assembly net weight max 37 kg Control unit net weight max 3 8 kg Throughput rate in a free passage mode 60 persons min Throughput...

Page 6: ...Plastic plug 4 Operational documentation Certificate 1 Operation manual 1 Packaging Box 1 Spare parts Plastic plug 1 Fuses 1 1 250 0 5 2 1 1 250 2 1 ACS connector DBH 15F cable socket 1 H9 connector c...

Page 7: ...le housing cable 8 AC power cables 9 mechanical release key 10 lock 11 hub 12 cover with LED indication display 13 CU indicators 14 rotation mechanism 15 dowel 16 anchor bolt 10 70 17 screw 4 20 18 fa...

Page 8: ...an upper part of the turnstile housing there is a rotation mechanism 14 with three barrier arms 2 a locking device a self centering mechanism and arm rotation sensors A LED indication display is locat...

Page 9: ...housing can be changed by switching the RC panel over to the Wireless connector of the CU Fig 2 The RC panel is equipped with a buzzer for audio signal generation Button push signals from the RC pane...

Page 10: ...rated from the RC panel from an ACS For connection layout please refer to Fig 8 see Appendix 5 3 1 Control with the remote control panel The following operating modes can be set from the RC panel see...

Page 11: ...d Sens L Pass L contacts is changed at passage in the opposite direction NOTE The variant of signal generation is set by the jumper on the J3 connector for the J3 connector location see label inside t...

Page 12: ...s 5 4 Unlocking of the turnstile with a mechanical release key The key 9 of the mechanical lock 10 is intended for unlocking of the turnstile in case of emergency or power failure at the AC mains swit...

Page 13: ...Manual Warning Use only the serviceable tools for installation Observe general electrical safety rules when laying out the cables All the connectors should be connected up when the CU is switched off...

Page 14: ...ntrol the vertical position of the turnstile during installation When forming the passage area through the turnstile take into account that the self centering mechanism operates as follows at the barr...

Page 15: ...Put the plugs 5 in their places 4 If you lay the turnstile cable 7 under the floor surface make a hole for the turnstile cable 7 and for the power supply cable 19 of the heating system with thermocont...

Page 16: ...TTR 04CW 24 Electromechanical Tripod Turnstile 15 Fig 5 Floor anchor position and cable entries for turnstile housing installation Fig 6 Wall dowel position for the CU installation...

Page 17: ...e same time the indicators 13 Power and 12V on the CU 3 the pictogram Red cross on the LED indication display 12 of the turnstile housing 1 and the indicator above the STOP button on the RC panel 4 wi...

Page 18: ...At the battery discharging up to the level of 10 4 V the turnstile turns to the Always closed mode the LED indication display is out the blinking mode of the Battery indicator and of the red indicator...

Page 19: ...t are on The turnstile is locked in the direction of completed passage 4 Free passage in the set direction open for multiple passages in the permitted direction Press the STOP button and the button co...

Page 20: ...ower panel The CU Power indicator is on but the 12V indicator is off The RC generates continuous audio signal The 12V 0 5 is burnt out likely due to external short circuit Disconnect the CU from the A...

Page 21: ...a qualified mechanic who has studies carefully this Manual Prior to the turnstile maintenance works disconnect the CU power supply from the AC mains set up the Power toggle switch to the OFF position...

Page 22: ...sensors 5 Connect the cable header of the indication board to the control mechanism connector and mount the cover with LED indication display 12 back into its place in the reverse order to the disman...

Page 23: ...e Q ty Note A1 Control unit CU 02N 1 A2 Remote control panel H 06 4 100 1 A3 Turnstile housing T 04W 24 1 A4 Wireless remote control 1 MSRF 4 A5 Power supply of the turnstile 1 12V 1 2 A6 Power supply...

Page 24: ......

Page 25: ...PERCo P O Box 87 Saint Petersburg 194295 Russia Tel 7 812 321 61 72 Fax 7 812 292 36 08 E mail export perco ru support perco ru www perco com...

Page 26: ...www perco com export perco ru...

Reviews:

Related manuals for TTR-04CW-24