VISUNET GMP DM
Safety
21
9365
2006
-0
6
5
1.3
System Operator and Personnel
The operator of the system is responsible in terms of planning, mounting, commissioning,
operating and maintenance.
Assembly, commissioning, operation, maintenance and dismounting of any devices may
only be carried out by trained, qualified personnel who have read and understood the
instruction manual.
1.4
Pertinent Laws, Standards, Directives and further Documentation
Laws, standards, or directives applicable to the intended use must be observed. In relation
to explosive areas, Directive 94/9 EC must be observed.
The corresponding data sheets, the declaration of conformity, the EC-type-examination
certificate and applicable certificates (see data sheet) are an integral part of this document.
1.5
Intended use
The devices are only approved for appropriate and intended use. Ignoring these
instructions will invalidate any warranty and absolve the manufacturer from any liability.
1.6
Installation and commissioning
The device must only be operated in the ambient temperature range and at the relative
humidity (noncondensing) specified.
To connect interfaces only use shielded cable.
To advance the cable shield screw/lock the connectors.
Lead data cable and power circuit line in separate cable channels.
Before commissioning the system check all cables and connectors.