2
02
2-
06
6
Fieldbus Surge Protector
Safety
1.3
System Operator and Personnel
Responsibility for planning, assembly, commissioning, operation, maintenance,
and dismounting lies with the plant operator.
The personnel must be appropriately trained and qualified in order to carry out mounting,
installation, commissioning, operation, maintenance, and dismounting of the device.
The trained and qualified personnel must have read and understood the instruction manual.
1.4
Pertinent Laws, Standards, Directives, and further Documentation
Observe laws, standards, and directives applicable to the intended use and the operating
location. Observe Directive 1999/92/EC in relation to hazardous areas.
The corresponding datasheets, manuals, declarations of conformity, EU-type examination
certificates, certificates, and control drawings if applicable (see datasheet) are an integral part
of this document. You can find this information under www.pepperl-fuchs.com.
Due to constant revisions, documentation is subject to permanent change. Please refer
only to the most up-to-date version, which can be found under www.pepperl-fuchs.com.
1.5
Marking
The Surge Protectors are marked with:
Electrical data see EC-type-examination certificate or datasheet.
Fuchs Group
Lilienthalstraße 200, 68307 Mannheim, Germany
TPH-LBF-IA1.36.DE.0
TPH-LBF-IA1.36.DE.1
SIRA 12 ATEX 2128X
II 1G Ex ia IIC T4
SIRA 12 ATEX 4176X
II 3G Ex nAc IIC T4 ,
II 3G Ex ic IIC T4
TCP-LBF-IA1.36.IE.0
TCP-LBF-IA1.36.IE.1
SIRA 12 ATEX 2128X
II 1G Ex ia IIC T4
SIRA 12 ATEX 4176X
II 3G Ex nAc IIC T4 ,
II 3G Ex ic IIC T4
SCP-LBF-IA1.36.IE.0
SCP-LBF-IA1.36.IE.1
SIRA 12 ATEX 2128X
II 1G Ex ia IIC T4
SIRA 12 ATEX 4176X
II 3G Ex nAc IIC T4 ,
II 3G Ex ic IIC T4