ICRL-U-8M12-G60 Manual
Installation
2021
-02
12
3. Installation
The ICRL-U-8M12-G60 has been developed for practical application in a harsh industrial environment. On
delivery, the device is ready for operation.
Perform the following steps to install the ICRL-U-8M12-G60:
•
Checking the package contents
•
Installing and grounding the device
•
Wiring the connector for the supply voltage
•
Operating the device
•
Connecting data cables
3.1. Checking the Package Contents
Before installation, verify that the following are available.
•
ICRL-U-8M12-G60 switch
•
1 × Transport protection cap for supply voltage connection
•
7 × Protection screws for M12 socket, plastic
•
15 × Indicator plates
•
1 x Right-angle cable socket (PG7, 4 Pin, Female connector)
•
Safety and general information sheet
3.2. Installing and Grounding the ICRL-U-8M12-G60
3.2.1. Mounting on a Flat Surface
The following requirements should be met to mount the ICRL-U-8M12-G60 on a flat surface:
•
Select the installation site so that the climatic threshold values listed in the technical data are observed.
See
•
Protect the exposed uninstalled contacts of the components from dirt and connect the individual system
components in a dry and clean working area.
•
Make sure to seal all unused connections and ports with the provided plastic protection screws to maintain
the IP65/67 suitability for your device,
•
Make sure to only connect components with degree of protection IP65/67 to sustain the IP65/67 suitability
for your device.
Note:
The torque for tightening the protection screws on the device is 5.3 lb- in (0.6 Nm).