2 Initial Operation
This description for initial operation refers to those issues that must be considered with respect to the power
supply ENT-DC. Information with respect to operation of the peripherals connected to the ENT-DC power
supply can be found in the appropriate manual.
For operation proceed as follows:
Switch off system or machine.
Make sure that the assembly area is non-hazardous during the initial operation in case voltages are wired or
devices will be opened that are not intrinsically safe.
Connect Exi power supply ENT-DC. Refer to the chapter “Wiring” for the appropriate connections.
Connect protective ground wire to the power supply ENT-DC.
Warning
The protective ground wire runs along the housing. The
housing itself must be grounded. The wire for
connecting to ground must have a cross section of at
least 2.5 mm² and should be as short as possible.
Connect power supply.
Verify all functions.
Switch on system or machine.
Verify functions of the entire system or machine.
Warning
In case the ENT-DC has not been connected correctly
or its configuration is incorrect, malfunctioning of your
system/machine is possible.
Warning
The power supply ENT-DC is exclusively designed to
be integrated into a different machine. Operation may
not be initiated until conformity of the final product with
regulation 89/336/EC and 89/392/EC has been
established and the unit has been approved by a
specialist according to EN 60079 and EN 50014
respectively.
Summary of Contents for ENT-DC-30
Page 30: ...7 Appendix EEx Certification...
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......