4/9
27550
3. Main P. C. Board (0-T100)
[Note of assembly]
3-1. When the viewfinder LCD is installed,
push the LCD to the direction of allow mark.
(Same as MZ-10)
3-2. Stick the tape (DT, PT and BT) as shown in the figure.
4. Main body
[Note of assembly]
The soldering position of winding motor (0-S200)
The length of the lead wire is different from MZ-5. In case of 0-S200 is replaced, lead wires
should also be replaced.
Pink (65mm)
0-S200
Brown (65mm)
Ground (GND) mark
Summary of Contents for 27550
Page 1: ......