
5
EVERPURE
®
CONSERV
®
LT
-
S HIGH EFFICIENCY RO SYSTEM INSTALLATION AND OPERATION GUIDE
2
Connect Valve to Storage Tank
3
Connect Tubing for Flushing
Precharge Storage Tank
5-7 psi (0.34 bar, 0.034 MPa)
3/8" Tubing
Product Water
Out
1
3
2
4
3/8" Tubing
To Storage
Tank
3/8"
Tubing
Supply
Water In
CLOSE
OPEN
4
Prepare to Flush the Everpure
®
4FC5 Cartridge
1
3
2
Connect
Electrical
Install
Bypass
Plug
CLOSE
Unplugged
Inlet Water