Page 12
4. Mark the position of the hole in each clamp on the equipment pad.
5. Use a masonry drill bit and drill a hole in the cement with a diameter as determined by the con-
crete anchor, at each of the marks on the equipment pad. The hole should be approximately 1½
in. deep.
6. Insert a bolt anchor into each of the holes. Be sure the anchors are set completely into the
holes.
7. Position the anchor clamps so that the holes in the clamps are over the bolt anchors. Be sure
that the clamp hooks are over the lip of the heat pump base.
8. Insert an anchor bolt through each clamp into the anchor and tighten to secure the clamp and
heat pump to the equipment pad.
250mm
(min)
250mm
(min)
250mm
(min)
1.5m
(min)
Clearance
HEAT PUMP
ANCHOR CLAMP
BOLT ANCHOR
(installer provided)
HEAT PUMP
BASE
1-3/8" HEX BOLT
(installer provided)
CONCRETE
EQUIPMENT PAD
ANTI-VIBRATION
PAD
Figure 2&3: Anchor Clamp Installation
Water Connections to the Heat Pump
1-1/2” / 40mm quick connect union fittings have been supplied for the water inlet and outlet con-
nections. Filtered cool water is plumbed to the inlet, as labelled. Heated water flows through the
outlet, as labelled. PVC piping (AS/NZS 1477) should be connected to the heat pump. The unions,
provided with the unit, accept 40mm PVC pipe.
INLET
OUTLET
INLET
OUTLET
Figure 4: Water Connections to the Heat Pump
Anchor Clamp Installation (Continued)
Installation