
MAINTENANCE INSTRUCTIONS
43
To enter the parameters menu, follow the previously described procedure (steps 1-5).
P
ARAMETER
1
–
T
YPE OF BOILER
6. Use buttons ‘+’ and ‘-‘to modify the value of the
parameter:
00 = PCC 34-H;
01 = PCI 18/8-H or PCI 34/20-H;
02 = PCH 34B-H, PCH18B-H or PCH 50B-H;
03 = DHW Temperature 95-160°F
– PCC 34 Only
7. Press and release button ‘S’ to confirm. The parameter
number (1) will appear on the display.
8. Switch off the appliance and switch it back on again to
render the new parameter operative.
P
ARAMETER
2
-
G
AS SUPPLY
6. Use buttons ‘+’ and ‘-‘ to modify the value of the
parameter:
00 = natural gas
01 = lp gas
7. Press and release button ‘S’ to confirm. The parameter
number (2) will appear on the display.
8. Switch off the appliance and switch it back on again to
render the new parameter operative.
P
ARAMETER
3
–
C
ENTRAL HEATING TEMPERATURE
Displayed in °C only
6. Use buttons ‘+’ and ‘-‘ to modify the value of the
parameter:
00 = standard (86
– 176°F)
01 = reduced (77
– 104 °F) for under-floor heating
7. Press and release button ‘S’ to confirm. The parameter
number (3) will appear on the display.
8. Switch off the appliance and switch it back on again to
render the new parameter operative.
P 01
S
S
S
S
S
S
00
01
P 02
01
P 03
110V 60Hz
110V 60Hz
110V 60Hz
110V 60Hz
110V 60Hz
110V 60Hz
Summary of Contents for PCI 20-H
Page 8: ...GENERAL INFORMATION 5 ...
Page 9: ...GENERALInformation 6 ING ...
Page 10: ...GENERALInformation 7 ...
Page 11: ...GENERALInformation 8 ...
Page 33: ...INSTALLATION INSTRUCTIONS 29 Venting Pictures Illustrations ...
Page 34: ...INSTALLATION INSTRUCTIONS 30 Included With Each Combination Boiler Is A PAHVK Horizontal Kit ...
Page 38: ...INSTALLATION INSTRUCTIONS 34 ...
Page 73: ...69 6 13 Sequence of Operations ...
Page 74: ......