
Bogie pivot components are supplied in the kit
to mate with the M2 nuts fitted to the tops of
the bolsters:
M2 x 10mm screws,
M2 x 6mm nylon insulators,
Brass tube 4mm OD x 3mm ID,
and M2 retaining washers (on the fret).
The diagram here shows the suggested pivot
arrangement to which the following instructions
apply. This arrangement is suitable for either
conventional or 'American' pick ups (with which the
bogie bolster is 'live'); the key attribute for the
latter being that the outer brass tube, and therefore
the loco chassis block, is electrically insulated from
the bolster top. The arrangement also secures the
bolster vertically, but allows some vertical movement to accommodate adjustments in ride
height.
Other arrangements are possible; the epoxy glue can be omitted and all components can
be shortened, for instance. If required, a thin insulating washer can then be placed on top
of the bolster to prevent electrical shorting to the brass tube.
Test the 4mm OD tube for a free sliding fit through the pivot holes in the loco's chassis
block. Open out the holes if and as necessary. Note that the fit is for the tube passing
perpendicularly through the hole; pitch and roll movements of the bogie are not
accommodated at this pivot.
Cut two sections of the 4mm OD tube about 4mm in length. Check that the nylon
insulators supplied are a free fit through the tube, opening out the bore if necessary.
Remove the M2 x 5.5mm diameter washers from the main fret.
Select a flat surface, free of any twist, of about the same length as the locomotive.
Place the bolsters on this surface, ensuring that their bases are straight and true such
that they sit perpendicular to the surface.
Rest the loco chassis over the bolsters, with the central holes in the bolster tops
aligned with the bogie pivot holes in the chassis, and the lower faces of the chassis
resting on the 'shoulders' of the bolsters.
At each pivot, pass one of the 4mm tubes through the hole in the chassis to rest on
t op of the bolster. Withdraw it approximately 1mm and glue it in place with quick-set
epoxy. To make sure it is aligned correctly, before the glue hardens pass the nylon
insulator through the tube and screw in the M2 screw with 5.5mm washer.
Allow the glue to set, then mark the protruding length of the M2 screw threads.
Remove the bolsters from the chassis and leave the glue to harden to full strength.
Trim the M2 screws so that they protrude no more than a thread or two below the
nuts in the tops of the bolsters.
Bachmann 24/25 Chassis Mods
34/51
(c) PenBits Model Railways, All Rights Reserved
27/09/2021
Summary of Contents for BACHMANN CLASS 24
Page 2: ......