6
NOTE:
Select the location for the cabinet that will meet the operator’s arm reach and storage requirements. Refer to
the dimensional drawings while considering the location of air, water and electrical connections.
NOTE:
Wall Stub-Out Specifications
Air & Water Shut-off Valves : 1/2" pipe N.P.T. (supplied by the contractor) protruding 1" from floor or wall.
Manual shut-off valve supplied by the dealer to be installed by the contractor. Maximum height can not
exceed 4" when valves are fully opened.
- Air pressure should be set at
70-80 PSIG.
- Water pressure should be set at
35-40 PSIG.
Central Vacuum: 5/8" OD tube protruding 1” from floor/wall.
Drain: 1-1/2” OD tubing protruding 1" from floor/wall.
Wall Stub-Out Locations
NOTE:
PREPARING THE SITE
1.013.2466 R00
Always lift cabinets by bottom edge, being careful to lift with your legs and not your
back.
Make all required air, water, and drain attachments from the utilities to the incoming
stub-up connections before the system installation occurs. Doing so prevents damage
to the utility lines from heat associated with some plumbing connection methods.
To ensure proper operation of the unit, flush air and water lines before connecting the
equipment.
Turn main power OFF at the installation site.
When installing the sterilization center, ensure it is bolted in place when installed
according to the instructions provided.
Use template to locate utilities in relation to operator’s reach. Because of varying city plumbing
and electrical codes, the dealer should ensure that installation meets local requirements. Pelton
& Crane cannot be responsible for an installation which does not meet local plumbing and electrical
codes
It is recommended to remove base boards on the back and/or side walls so that the cabinet will
be flush to the wall or mounted on a flat finish wall.
WARNING: