
Page 14
#109998-001 - Product Manual - #1325D Axial Ventialtor
- Revision 07 - Date: 07-13-2016
Prior to Operation, the #1325D Axial Ventilator should be configured and prepared according to the following guide
-
lines.
1. Pre-Operation Inspection:
It is necessary to perform a visual inspection, each time, prior to using the product. If deficiencies are found, remove the
product from service and contact the T.A. Pelsue regarding repair. The following checklist coupled with
Figure #5.2a
should be used as a guide to determine whether the equipment is in good operating condition prior to usage. Equipment
that is not in good condition can endanger the safety of the entrant and attendant during use.
The Pre-Operation Visual Inspection is not limited to, but must include the following items;
a.
Check the Ventilator inlet and outlet guard screens for obstructions.
b.
Remove any objects around the immediate area that could be sucked into the Ventilator.
c.
The cordset is properly attached to the Ventilator.
d.
The rubber feet are attached.
5.2 - Start-Up & Operating Procedures
Figure #5.2a:
#1325D Axial Ventilator
Pre-Operation Inspection Points
Inlet Guard
Cordset
Rubber Feet
Outlet Guard