background image

E. 

Apply sill flashing tape #1. 

#UTAPIECEOFmASHINGTAPELONGER

THANTHEOPENINGWIDTH!PPLYATTHEBOTTOMOFTHEOPENINGASSHOWN% SOITOVERHANGS
TOTHEEXTERIOR

Note: The tape is cut 12" longer than the width so that it will extend 6" up each side of 
the opening.

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

A. 

Make sure the bottom of the opening is level.

Note: It is critical that the bottom is level for the window to be 
installed correctly.

B. 

Verify the window will fit the opening.

 Measure all four sides of 

THEOPENINGTOMAKESUREITISLARGERTHANTHEWINDOWINBOTH

width and height. On larger openings measure the width and height in 
several places to ensure the header or studs are not bowed.

Note: 1-1/2" or more of solid wood blocking is required around the 
perimeter of the opening. Fix any problems with the rough opening 
before proceeding.

C. 

Cut the water resistive barrier (1C). 

Additional cutting patterns 

given below.

D. 

Fold the water resistive barrier (1D).

 Fold side flaps into the 

opening and staple to inside wall. Fold top flap up and temporarily 
fasten with flashing tape.

F. 

Tab the sill flashing tape and fold.

#UTWIDETABSATEACHCORNERFROMEACHSIDEOF

CORNER & &OLDTAPETOTHEEXTERIORANDPRESSlRMLYTOADHEREITTOTHEWATERRESISTIVEBARRIER

1

ROUGH OPENING PREPARATION

*OUFSJPS

£

£ 

*OUFSJPS

UI

DVU

.BLFBDVUVQGSPN
FBDIUPQDPSOFSBUB¡
BOHMFUPBMMPXUIFXBUFS
SFTJTUJWFCBSSJFSUPCF
MBQQFEPWFSUIFmOBUUIF
IFBEPGUIFXJOEPX

TU

DVU

OE

DVU

8BUFS3FTJTUJWF#BSSJFS

UI

DVU

$VUEPXOUPNFFUUIF
¡DVUPOFBDIDPSOFS

£

SE

DVU

&YUFSJPS

%

£

£

£

'

Apply sill flashing tape #2.

 Cut a piece 

OFmASHINGTAPELONGERTHANTHE

opening width. Apply at the bottom, 

OVERLAPPINGTAPEBYATLEAST$O
NOTALLOWTHETAPETOEXTENDPASTTHE
INTERIORFACEOFTHEFRAMING'

Note: The flashing tape may not fully 
cover the framing members.

Summary of Contents for 801U0102

Page 1: ...of the terms of the sale Failure to comply with all Pella installation and maintenance instructions may void your Pella product warranty See Limited Warranty for complete details at http warranty pel...

Page 2: ...ny problems with the rough opening before proceeding C Cut the water resistive barrier 1C Additional cutting patterns given below D Fold the water resistive barrier 1D Fold side aps into the opening a...

Page 3: ...them and store them in a protected area 2 SETTING AND FASTENING THE WINDOW C Fold out installation n to 90 N UNITS WITH PRE APPLIED lN CORNERS BE CAREFUL NOT TO REMOVE OR TEAR THE lN CORNERS Note If t...

Page 4: ...ns are folded out to 90 at all points Fasten the window to opening N WINDOWS WITH A lXED EXTRUDED lN DRILL DIAMETER HOLES IN THE lN EVERY A Units that do not have pre applied n corners UT FOUR PIECES...

Page 5: ...e the length of cuts hold the tape along the radius and cut the tape just past where it LEAVES THE TOP lXED EXTRUDED lN OR FOR THE mEXIBLE lN JUST PAST THE mEXIBLE WEATHER STRIP 4HE top tape must over...

Page 6: ...ll the space from the back of the n to the interior face of the opening 5 SEALING THE WINDOW TO THE EXTERIOR WALL CLADDING When applying siding brick veneer or other exterior nish material leave adeq...

Page 7: ...INGLE HUNG AND DOUBLE HUNG DO NOT PAINT STAIN OR lNISH THE VERTICAL SASH EDGES ANY lNISH ON THE VERTICAL SASH EDGES MAY CAUSE THE SASH TO STICK IT IS OPTIONAL TO PAINT STAIN OR lNISH THE HORIZONTAL SA...

Page 8: ...or proper management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of a...

Reviews: