![PEKO ETS-1500 Installation And Operating Manual Download Page 10](http://html1.mh-extra.com/html/peko/ets-1500/ets-1500_installation-and-operating-manual_1522292010.webp)
Page 10
OPERATING INSTRUCTIONS
OPERATING CONTROL PANEL
The cabinet is designed with two control switches for ease of use.
The left hand switch controls heat settings. The ‘0’ position circulates
ambient temperature air only. Rotating the switch position in a clock-
wise movement increases the heat input up to a maximum 1.5 kW.
The optimum setting is with the control set to the start of the double
line sector on the scale for lower energy consumption.
The right hand switch controls the drying time up to a maximum of 4
hours.
Installation and Operating Manual