PEERLESS Solid-Point PLCM UN1 Installation And Assembly Manual Download Page 2

ISSUED:09-08-07    SHEET #: 202-9199-1

Visit the Peerless Web Site at www.peerlessmounts.com

For customer care call 1-800-729-0307 or 708-865-8870.

2 of 9

• Do not begin to install your Peerless product until you have read and understood the instructions and warnings

contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, please
call Peerless customer care at 1-800-729-0307.

• This product should only be installed by someone of good mechanical aptitude, and fully understands

these instructions.

• Never exceed the Maximum UL Load Capacity.

• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.

• Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding

power.

• Installer must verify that the ceiling will safely support the combined weight of all attached equipment and hardware.

WARNING

Table of Contents

Parts List .............................................................................................................................................................................. 3

Installing Ceiling Plate (model PLCM-UN1-CP only) .............................................................................................................. 4

Installing Flat Panel Straight Column Mount to ceiling .......................................................................................................... 5

Installing Adapter Plate ......................................................................................................................................................... 6

Installing Adapter Plate to Screen ..................................................................................................................................... 7, 8

Installation of Screen to Flat Panel Straight Column Mount .................................................................................................. 9

Summary of Contents for Solid-Point PLCM UN1

Page 1: ...ly Solid Point Flat Panel Straight Column Mount R This product is intended for use with UL Listed products and must be installed by a qualified professional installer Installer must verify that the ce...

Page 2: ...itude and fully understands these instructions Never exceed the Maximum UL Load Capacity Always use an assistant or mechanical lifting equipment to safely lift and position equipment Tighten screws fi...

Page 3: ...x 2 125 ID x 062 H fiber washer 1 540 9432 G M10 x 15 mm penta pin screw 8 520 9263 H M10 x 2 penta pin tool 1 520 9260 I M5 x 1 penta pin tool 1 520 9249 J M5 x 8 mm phillips screw 4 520 1167 K adapt...

Page 4: ...h concrete expansion anchors directly to load bearing concrete Never attach concrete expansion anchors to concrete covered with plaster drywall or other finishing material WARNING For Wood Joist Finis...

Page 5: ...holes in the sides of ceiling arm box A Leave approximately 1 4 of exposed thread Slide ceiling arm box A and fiber washer F onto end of support pipe C Thread retaining collar D onto threaded end of...

Page 6: ...bracket L as shown in figure 3 2 below reverse bracket mounting K L fig 3 2 Bracket Mounting Reverse K L fig 3 1 Bracket Mounting Standard c channel c channel To assemble the adapter bracket K to you...

Page 7: ...as knobs on the back remove them Place adapter bracket K on the center of the screen Slide the vertical brackets L along the c channels of the adapter bracket K until the slots on the back of the vert...

Page 8: ...e screen using screws upper and lower spacers as pictured Verify that all holes are properly aligned then use the security allen wrench N to tighten the screws Note See figure 6 below for slot sizes E...

Page 9: ...er four M10 x 15 mm socket pin serrated washer head screw G as shown below Set desired tilt and tighten all fasteners Note Wall not shown for clarity 7 G A B 2007 Peerless Industries Inc All rights re...

Reviews: