ISSUED 08-09-06 SHEET #: 055-9470-1
Visit the Peerless Web Site at www.peerlessmounts.com
5 of 11
For customer care call 1-800-729-0307 or 708-865-8870.
Drill two 5/32" (4 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach projector mount assembly (
A
) with
two #14 x 2.5" (6 mm x 65 mm) wood screws (
V
) and two flat washers (
I
) as shown in
figure 1
or
figure 2
depending on joist orientation. Tighten wood screws (
V
) using 3/8" (10 mm) socket wrench until projector mount
assembly (
A
) is firmly attached.
Note:
Be sure to drill holes into the joist CENTER!
Skip to step 4.
Installation To Wood Joist Finished Ceilings,
Exposed Wood Joists, or Wood Beam Ceilings
V
V
A
WOOD JOIST
FRONT OF
MOUNT
I
I
FRONT OF
MOUNT
WOOD JOIST
A
figure 1
figure 2
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
WARNING
• Do not tighten screws with excessive force.
Overtightening can damage screws, greatly reducing
their holding power. Tighten to 80 in • lb (9 N.M.)
maximum torque.
CAUTION
3