ISSUED: 08-15-07 SHEET #: 055-9188-6 06-25-10
Visit the Peerless Web Site at www.peerlessmounts.com
6 of 13
For customer care call 1-800-865-2112 or 708-865-8870.
Place projector mount assembly (
A
) on ceiling as a
template and mark the center of the two mounting
holes. Drill two 1/4" (6 mm) dia. holes to a minimum
depth of 2.5" (64 mm). Attach projector mount
assembly (
A
) using two concrete anchors (
G
), two
fl at washers (
E
), and two #14 x 2.5" wood screws
(
F
) as shown.
NOTE:
Mounting slots on projector mount assembly
allow for 30° (±15°) of rotation before fully securing
wood screw.
Tighten wood screws (
F
) using 3/8" (10 mm) socket
wrench or phillips screwdriver until projector mount
assembly (
A
) is fi rmly attached.
Skip to step 5.
F
Installation to Concrete Ceilings
A
E
G
FRONT OF
MOUNT
• Tighten wood screws fi rmly, but do not overtighten.
Overtightening can damage the screws, greatly re-
ducing their holding power.
• Never tighten in excess of 80 in • lb (9 N.M.).
WARNING
3
• Always attach concrete anchors directly to load-
bearing concrete.
• Never attach concrete anchors to concrete covered
with plaster, drywall, or other fi nishing material. If
mounting to concrete surfaces covered with a fi nish-
ing surface is unavoidable (not evaluated by UL), the
fi nishing surface must be counterbored as shown be-
low. Be sure concrete anchors do not pull away from
concrete when tightening screws. If plaster/drywall is
thicker than 5/8", custom fasteners must be supplied
by installer (not evaluated by UL).
WARNING
concrete
surface
1
3
2
G
Drill holes and insert anchors (
G
).
Place plate (
A
) over anchors (
G
) and secure with screws (
F
).
Tighten all fasteners.
A
G
F
CUT
A
W
A
Y
VIEW
INCORRECT
CORRECT
plaster/
dry wall
concrete
concrete
plaster/
dry wall
A
A
• Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
WARNING