PeakTech
®
1140
3
2. INSTALLATION
2.1 Power Supply
This instrument requires a power source of 100V ~ 240V AC, 50 Hz / 60Hz. AC voltage is
automatically selected to proper input range. A 3P power cord as provided with instrument grounds the
instrument chassis when connected through the compatible power receptacle.
Do not use the unit if the safety ground is broken.
Fuse is 1 A (250V) at of 100V ~ 240V “ Time delay ” type.
2.2 Incoming confidence check
Prior to packaging the instrument for shipment, extensive operational, alignment, and calibration
procedure were performed by
PeakTech
®
to verify that the instrument is operating to
specifications.
To ensure the electronic integrity of the instrument on your receiving bench, you must perform the
following confidence check:
As certain that the operating voltage, then connect the AC power cord to the mains.
Turn on power.
The display will be as follows ( System Booting )
Finally the display will be as follows
1
st
G01:Stream_Tone_data
G02:Broadcasting Ex
G03:Stream_DMB
G04:Stream for BER (MSC)
↓
Warm up 1 minutes and connect the Up-Converter (
PeakTech
®
1140)
Check the DAB/DMB receiver operating
This completes the incoming confidence check.
The instrument can now be placed in.