Fountain Crescent
Inchinna Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W:
www.peakscientific.com
E:
Part No. IG-Genius 3023
Rev.
01
Page
Page 3 of 9
6.
7.
Remove the LH side panel as before,
taking care to disconnect the earth lead
located on the inside of the door panel.
Repeat steps 4 and 5 to remove the LH transit
brackets located under both of the LH
compressors. These will pull out in the same
way.
**NOTE**
Do not discard the transit brackets or screws as these will be needed again if the
unit is to be transported from its current location.
8.
9.
From the fittings kit, select one of the 6mm
push-fit fittings and connect it to the port
marked
‘DRAIN’
on the rear of the unit using a
16mm or 5/8” spanner.
Fit the silencers fitting into the ports marked
‘NITROGEN’
. These only needs to be hand
tight as these are a temporary fitting for the
purge run and will be removed again prior to
connecting to the instrument.
Connect the 4m Nylon tube to the drain
line, ensure the tube is pushed fully in and
gripped securely by the fitting.
Fit the other end of the drain line to a
suitable drain connection or container. The
container must
NOT
have an airtight seal
as water and air will be expelled
periodically under a slight pressure.
2m Nylon to Drain