VII. MAINTENANCE SCHEDULE
Monthly:
1. Re-torque the anchor bolts to 150 Nm.
2. Check all fittings, bolts and pins to insure proper mounting.
Note:
All anchor bolts should take full torque. If any of the bolts does not function
for any reason,
DO NOT
use the lift until the bolt has been replaced.
3. Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage.
4. Adjusting the lifting level on both platforms.
5. Lubricate all moving parts with lubricant
(Sea Fig. 47-52)
.
For Main Cylinder
Fig.49
For shaft of piston rod of Main cylinder
Fig.50
For pins of connecting
platforms and scissors
Fig. 51
For pins of connecting
platforms and scissors
Fig. 52
30
Summary of Contents for AMGO PX12
Page 1: ...PX12 PX12A X550 X550A...
Page 25: ...50 IV EXPLODED VIEW MODEL PX12A X550A Optional Turnplate Fig 40 95 23...
Page 26: ...51 MODEL PX12 X550 Fig 41 24...
Page 27: ...52 CYLINDERS Fig 42 Add grease to lubricate regularly Add grease to lubricate regularly 25...
Page 28: ...53 CONTROL CABINET Fig 43 26...
Page 29: ...54 PEAK ELECTRIC POWER UNIT 220V 50HZ 1Phase 380V 50HZ 3 Phase Fig 44 27...
Page 41: ...72115304 01 2017...