Commissioning
10
This should be undertaken by a technically competent person.
Prior to installing the generator into the Rack Cabinet, remove the lid. Check that all the internal
components are securely located and have not moved during transit. Refit the lid.
Open the air supply and switch the Power supply
ON
to unit
.
Set the regulator on the front panel /
Regulator to the desired pressure.
Check that the cooling fan at the rear of the generator is operating and exhausting air out of the
generator.
Check the Digital display on the front panel is increasing temperature Maximum 400°c this can take
up to 40minutes from initial switch On.
ZA-070-19”Rack System Gas Generator
UM – ZA-070