PDPG-H Manual
Page 8
2.3. Install
2.3.1 Setup
▶
Front panel of PDPG and pressure controller facing you, it shall be placed on the
table.
▶
After placed PDPG system, using height adjustment knob and see the level for
adjusting horizontal.
▶
User can choose the placement of the platform and pressure controller. but here is
recommended placement is as follows.
ex) From left side
Mass Set
→
PDPG Platform
→
Pressure Controller
→
Multi-Test port
2.3.2 Pressure Tubing Connection
General information for connection
▶
Connect the PDPG platform with pressure controller that using PDK supplied
connection kit.
▶
Using tubing line(PDK Supplied) to connect rear test port of PDPG platform and
side port of pressure controller.