![PCM PINO 3.0 Building Instructions Download Page 9](http://html1.mh-extra.com/html/pcm/pino-3-0/pino-3-0_building-instructions_1516277009.webp)
www.modellmarkt24.ch; www.modellmarkt24.de
PINO 3.0 Building Instruction
August 2018
www.pcm.at
9
5. FUSELAGE
5.1 Servos
All necessary
holes
are
already
pre-milled
.
The holes for the servos are
especially dimensioned for
the
KST DS 215MG V3.0
.
You just have to screw in the
servos and connect them to
the pushrods.
Set the servos and the
controls (elevator and the
rudder) to the
zero position
and
connect
them.
(here is a picture of Pino
2.5m shown)
The
lever lengths
are:
Elevator: 7mm
Rudder: 7mm
Next, let’s finish the
aileron
and flap contacts
for the
fuselage.
The
cable length
should be
about
35cm
.
Pay attention that you solder
the contacts
in the same
way
as they are soldered in
the wings.
Double the contacts
again
for redundant connection.
www.modellmarkt24.ch; www.modellmarkt24.de