11
Begin means begin date MM-DD-YY or DD-MM-YY or YY-MM-DD it depended on
what is the date mode set in "SET" function.
End means end date,same as above.
Start means start time,HH/MM/SS Suspend means stop time,HH/MM/SS
Rate means the time period to get the data.For example "60" means to get the value
every 60 seconds.The rate could be from 1 to 9999.
5. Meter will record date time and value when the data logger is activated.Please
refer to below figure
6.How to stop data logger
Press "0" twice to stop the data logger or the data logger will automatically stop
after sampling 99 points