5.7 

EnerSave function 

If you press the [ON/TEST] key to start a measurement, it will be terminated automatically after 
10 seconds. If you wish to measure for a longer time, press and hold the [ON/TEST] key until you 
hear a short sound, which means that the EnerSave function is disabled.  
 
The EnerSave function must be disabled everytime you wish to make a longer measurement. 

5.8 

[LOW 

Ω] key for continuity tests 

Press the [LOW Ω] key to make a continuity test. A short circuit current of 200 mA will be used. 
The meter can display very small resistances of up to 0.01 ohms. 

5.9 

[

LOW Ω] key for Auto Zero 

Press the [LOW 

Ω] key to zero the resistance, the test leads and the fuse. This function is useful 

if you use longer test leads. 
Do not forget to short-circuit the test leads when making a zero setting. 

5.10 

[1000V] key for power off (Auto Power Off) 

Press and hold the [1000V] key for 5 seconds to switch off the meter. 
After 5 minutes without pressing any key, the meter will turn off automatically. 

5.11 

Automatic discharge after an insulation measurement 

After each insulation measurement, the meter will be discharged automatically. The status of the 
discharge will be displayed in the meantime. The discharge is finished when no voltage is present 
any longer. Before that, the test leads must not be removed. 
 

Safety checks before the measurement 

Check  the  cables  for  damage  and  cracks  and  replace  them,  if  required.  Also  inspect  the  fuse 
before each measurement by holding the test leads against each other in [LOW 

Ω] mode. At the 

same time, the measurement resistance will be set to zero. Always connect the test leads to the 
circuit to be measured safely and correctly. Never interrupt the connection during a measurement 
and do not touch the test tips or the sample as the safety mechanisms are not fully effective during 
the  measurement.  Always  follow  the  instructions  on  the  display.  Do  not  start  a  measurement 
before the test leads have been properly connected to the sample. 
 

Changing the fuse 

In order to change the fuse, follow these steps: 
First  remove  all  test  leads.  Now  open  the  battery  compartment  and  remove  all  batteries.  Now 
open the case by loosening both screws in the battery compartment. Now you can change the 
fuse. Close the meter and re-insert the batteries. The meter can be used again when the battery 
compartment has been closed. 
 

 

Summary of Contents for PCE-IT 120

Page 1: ...nsulation Tester User Manual User manuals in various languages fran ais italiano espa ol portugu s nederlands t rk polski can be found by using our product search on www pce instruments com Last chang...

Page 2: ...Hold 5 5 5 250 V 500 V 1 kV insulation resistance measurement 5 5 6 ON TEST key measuring function 5 5 7 EnerSave function 6 5 8 LOW key for continuity tests 6 5 9 LOW key for Auto Zero 6 5 10 1000V k...

Page 3: ...and the test leads Do not use the instrument in explosive atmospheres The measurement range as stated in the specifications must not be exceeded under any circumstances Non observance of the safety no...

Page 4: ...use Double insulated We do not assume liability for printing errors or any other mistakes in this manual We expressly point to our general guarantee terms which can be found in our general terms of b...

Page 5: ...ce continuity 0 01 1999 Resolution Insulation 1 10 100 M ACV 1 V DCV 1 V Resistance continuity 0 01 0 1 1 Accuracy Insulation 0 1 M 4 G 3 4 G 8 G 5 ACV 1 5 DCV 1 5 Resistance continuity 2 0 DC test vo...

Page 6: ...is in sound condition the meter will go through a voltage test to make sure no voltage is present in the meter or circuit If a voltage is present which could cause a problem for the meter the meter w...

Page 7: ...Hold The Auto Hold function is always enabled visible on the display This function holds the last valid measured value so that it is displayed even after disconnecting the test leads This allows you t...

Page 8: ...on measurement the meter will be discharged automatically The status of the discharge will be displayed in the meantime The discharge is finished when no voltage is present any longer Before that the...

Page 9: ...ill hear a sound 9 Warranty You can read our warranty terms in our General Business Terms which you can find here https www pce instruments com english terms 10 Disposal For the disposal of batteries...

Page 10: ...583 975 114 Fax 49 0 2903 976 99 9971 Fax 44 0 2380 98703 9 Fax 39 0583 974 824 info pce instruments com info industrial needs com info pce italia it www pce instruments com deutsch www pce instrument...