
USING THIS MANUAL
1
A. INSTALLATION SEQUENCE . . . . . . . . . . . . .1
B. SPECIAL ATTENTION BOXES . . . . . . . . . . . .1
1. PREINSTALLATION
2
A. ACCESSIBILITY CLEARANCES . . . . . . . . . . .2
B. CLEARANCE FROM COMBUSTIBLE
CONSTRUCTION . . . . . . . . . . . . . . . . . . . . . .2
C. AIR FOR COMBUSTION AND
VENTILATION . . . . . . . . . . . . . . . . . . . . . . . . .2
D. INSTALLATION SURVEY . . . . . . . . . . . . . . . .5
E. PLANNING THE LAYOUT . . . . . . . . . . . . . . . .5
2. BOILER SET-UP
6
3. WATER PIPING AND CONTROLS
7
A. BOILER SUPPLY AND RETURN . . . . . . . . . . .7
B. SAFETY RELIEF VALVE . . . . . . . . . . . . . . . . .8
C. PIPING FOR ZONED SYSTEMS . . . . . . . . . .9
D. EXPANSION TANK . . . . . . . . . . . . . . . . . . . .10
E. INDIRECT-FIRED WATER HEATER . . . . . . .10
F. FREEZE PROTECTION . . . . . . . . . . . . . . . . .10
4. VENTING
11
A. VENT PIPING AND CHIMNEY . . . . . . . . . . .11
B. INTEGRAL DRAFT HOOD . . . . . . . . . . . . . .11
C. VENT DAMPER INSTALLATION –
GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . .11
D. BOILER REMOVAL FROM COMMON
VENTING SYSTEM . . . . . . . . . . . . . . . . . . .13
5. GAS PIPING
14
6.
ELECTRICAL
16
A. WIRING . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
B. ZONED SYSTEM WIRING . . . . . . . . . . . . . .16
C. CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . .16
D. SEQUENCE OF OPERATION . . . . . . . . . . . .19
7. START-UP PROCEDURES
21
A. COMPLETING THE INSTALLATION . . . . . .21
B. CONTROL DESCRIPTIONS . . . . . . . . . . . . .24
C. ADJUSTMENT OF GAS PRESSURE
REGULATOR . . . . . . . . . . . . . . . . . . . . . . . . .24
D. CHECKING BURNER INPUT . . . . . . . . . . . . .24
E. CHECK-OUT PROCEDURE . . . . . . . . . . . . . .25
8. TROUBLESHOOTING
26
A. SHUT-DOWN CAUSED BY PILOT OUTAGE,
BLOCKED VENT SHUT-OFF SWITCH OR
FLAME ROLL-OUT SAFETY SHUT-OFF
SWITCH . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
B. TROUBLESHOOTING GUIDES . . . . . . . . . .26
9. MAINTENANCE
29
A. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . .30
B. DAILY (WITH BOILER IN USE) . . . . . . . . . . .30
C. WEEKLY (WITH BOILER IN USE) . . . . . . . . .30
D. MONTHLY (WITH BOILER IN USE) . . . . . . .30
E. ANNUALLY (BEFORE START OF HEATING
SEASON) . . . . . . . . . . . . . . . . . . . . . . . . . . .30
10. BOILER DIMENSIONS & RATINGS
32
11. REPAIR PARTS
33
A. BASE/COMBUSTIBLE FLOOR PAN . . . . . . .33
B. MANIFOLD, GAS VALVE & PILOT . . . . . . . .34
C. BLOCK/DRAFT HOOD & JACKET . . . . . . . .36
D. CONTROLS/CIRCULATOR/VENT
DAMPER & CONVERSION KITS . . . . . . . . .38
TABLE OF CONTENTS
TABLE OF CONTENTS
Summary of Contents for MI85 Series
Page 1: ...MI85 Boilers Series Gas Installation Operation Maintenance Manual...
Page 20: ...18 ELECTRICAL Figure 6 4 Wiring Diagram Intermittent Ignition 3200 Control...
Page 21: ...19 Figure 6 5 Intermittent Ignition System Operating Sequence ELECTRICAL...
Page 22: ...20 ELECTRICAL Figure 6 6 Zone Wiring with Zone Valves Figure 6 7 Zone Wiring with Circulators...
Page 24: ...22 START UP PROCEDURES Figure 7 3 Operating Instructions...
Page 25: ...23 Figure 7 4 Operating Instructions START UP PROCEDURES...
Page 36: ...34 REPAIR PARTS Figure 11 2 Manifold Figure 11 3 Gas Valve and Pilot Intermittent Ignition...
Page 38: ...36 Figure 11 4 Block Draft Hood Figure 11 5 Jacket REPAIR PARTS...
Page 40: ...38 Figure 11 6 Controls Circulator Vent Damper REPAIR PARTS...
Page 42: ...40 NOTES...