Powerbar
iMPB
Step 5.
Tighten the joint pack center bolt to 25Nm using a calibrated torque
wrench. If installed correctly the joint will appear level.
*The joint pack center bolt should be torqued to 25Nm
(221 in/lbs)
Step 4.
Attach the Bottom Joint pack cover using the M6 socket cap screws
provided. Tighten to 10Nm.
Bottom Joint pack cover
Page 04
Cable End Box
This is generally the fi rst component to be mounted on a run.
The entire route should initially be inspected for any obstructions before installation.
The box should be installed at the correct height in accordance with the approved drawings.
A plumb line should be applied at this point from the start of the run to the end of the run, as a guide for the installation of the Busbar Run.
Joint Pack
Gland/Conduit plate
*A Joint Pack is pre-fi tted to each cable
end box which determines the neutral
side of the busbar run. The approved
drawings will show this detail.
Joint pack Center Bolt
Summary of Contents for iMPB
Page 1: ...iMPB Installation Manual...