background image

www.powerbarsystems.com

Page 01

Introduction

Powerbar Ltd supply all busbar sections 

tested in accordance with type test 

requirements as detailed in IEC61439-6

or UL857 and are subject to a full Quality 

Check before packaging. 

In order to ensure that the Busbar remains 

in this condition during transport, 

unpacking and installation on site, it is 

important to study this document.    

If the guidelines outlined within this 

document are not adhered to, this could 

give rise to the damage of the product, 

electrical failure of the Busbar, personal 

injury, or even death.

Manual Lifting

In accordance with Manual Lifting 

Regulations the guidelines below are 

provided to reduce risk of injury to 

personnel and damage to equipment 

during transport and installation of 

busbar section.

PPE (Personal Protection Equipment) 

should be worn at all times in accordance 

with Health and Safety Regulations and 

specifi c site requirements. When lifting 

Busbar sections, care must be taken to lift 

each section along its center and not by 

the end sections or conductors.

Mechanical Lifting

Some sections of Busbar may require 

mechanical lifting due to their weight.

Options for mechanical lifting includes 

Genie® Lift™, forklift, scissor lift, platform 

lift and block and tackle. A full assessment 

of the risks should be carried out by the 

installer before commencing work. 

The Busbar must be safely secured to the 

lifting apparatus before lifting. 

Always check that the load does not 

exceed the safe working load of the lifting 

apparatus. Ensure that equipment is used 

as per manufacturer’s guidelines.

Storage

The Busbar will be delivered to the 

customer neatly stacked on a wooden 

pallet for ease of removal.  The maximum 

weight of the pallet will not exceed 

2500kg / 5500lbs. 

The Busbar is protected from minor water 

ingress by means of an overall outer 

polythene wrap which should be left in 

position until the bar is mounted.

If the Busbar is not to be installed 

immediately upon delivery it should be 

stored in a heated, clean, dry area. Busbar 

should never be stored outdoors.

This Installation Manual is designed to assist in the Safe Handling and Installation of 

the iMPB system.  These instructions are in addition to normal safe working practices 

as required by the local health and safety regulations.  These instructions do not in 

any way advocate a departure from these requirements.

THIS EQUIPMENT 

OPERATES AT 
MAX 600V PHASE

   

 

                                                           

Ensure COMPLETE electrical 
isolation, verifi cation and lock off  

of supply device in accordance 

with isolation procedures for 
the particular installation prior 
to carrying out installation 

of the busbar , inspection, or 
maintenance.

Only Powerbar approved 

installation personnel may carry 

out installation of this product. 

If training is required contact 
Powerbar using the details at 
the back of the brochure and 

specify the nature of the training 
requirements. Training can 

be provided on site or at our 
manufacturing facility.

Handling

Summary of Contents for iMPB

Page 1: ...iMPB Installation Manual...

Page 2: ...must be safely secured to the lifting apparatus before lifting Always check that the load does not exceed the safe working load of the lifting apparatus Ensure that equipment is used as per manufactur...

Page 3: ...ts Care is to be taken not to damage ends of the busbar during installation Powerbar recommends the hanging brackets be mounted no more than 1 5 metres 5 apart Ensure that each section of busbar has a...

Page 4: ...ar orientation and site conditions may restrict installers from adhering to this methodology In these cases installers must be cautious and ensure the joint pack is installed correctly Ensure all part...

Page 5: ...ally the first component to be mounted on a run The entire route should initially be inspected for any obstructions before installation The box should be installed at the correct height in accordance...

Page 6: ...omprise an arrangement of enclosure circuit breaker monitoring device on load isolator and safety interlocks which provide a unique set of safety features for installation and allow the tap off module...

Page 7: ...ll connected load to the Busbar Trunking via tap offs for example should be isolated prior to energizing the bar The Main Supply switch to the Busbar is to be energized first The Protection Settings s...

Page 8: ...66536 E I Engineering Corporation USA Manufacturing Location 400 Supreme Industrial Drive Anderson South Carolina 29621 Tel 1 864 375 1757 E I Engineering LTD European Manufacturing Location Ballydero...

Reviews: