16
THERMOSTAT DIAGRAM 3
ETC101
(Low Voltage Only)
THERMOSTAT DIAGRAM 4
Inserting the probe wires into the press release connector
4.A
– Position tool on top of white buttons
4.B
– Push Down on buttons and push wires Down into holes in
top of connector (This can also be done one side at a time)
4.C
– Tug on each wire to make sure they are secure
Summary of Contents for Peerless Partner PV-120
Page 16: ...15 THERMOSTAT DIAGRAM 1 THERMOSTAT DIAGRAM 2...
Page 22: ...21 FIGURE 3 Typical Piping Peerless PureFire Boiler...
Page 23: ...22 FIGURE 4...
Page 30: ...29 NOTES...