background image

 
 
 

 

 

Operation and Installation Manual 

 
 

Peerless

®

 

Partner

®

 PV 

Series Indirect Fired Water 

Heater

 

 

Limited Warranty and Tank 

Replacement 

 
 
 

 

Summary of Contents for Peerless Partner PV-120

Page 1: ...Operation and Installation Manual Peerless Partner PV Series Indirect Fired Water Heater Limited Warranty and Tank Replacement...

Page 2: ...lation and care in use of the product There is risk of property damage and personal injury inherent in the use of any hot water system The Company cannot supervise the installation and therefore makes...

Page 3: ...ol SR503 EXP shown 18 Zoning Panel with HydroStat 3250 Oil Boiler control SR503 shown 19 Zoning Panel with PureFire Boiler SR503 shown 19 FIGURE 1 20 FIGURE 2 20 FIGURE 3 21 FIGURE 4 22 PARTS LIST 23...

Page 4: ...r Rating gal h Min Heat Source output MBH Min Heat Source Flow gpm Heat Source Friction Loss Feet w c PV 40 30 0 0 8 177 199 115000 8 0 18 7 PV 60 55 0 0 6 177 217 115000 8 0 18 7 PV 80 80 0 0 4 315 3...

Page 5: ...mage in the event of a leak Place the heater on a solid foundation in a clean dry location nearest the boiler The heater should be protected from freezing and water lines should be insulated to reduce...

Page 6: ...ent of materials as meeting the requirements for Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems ANSI Z21 22 1971 This valve must be marked with maximum set pressure not to exceed...

Page 7: ...t is recommended to use unions as per FIGURE 1 and FIGURE 2 Do not apply heat directly to the cold water inlet as it includes a plastic dip tube which will melt Water connections are 3 4 male threaded...

Page 8: ...by a steady flow of water from the open faucet H THERMOSTAT INSTALLATION Place hole in back of Thermostat over the temperature sensor leads It should fit flush against the tank Use the provided self...

Page 9: ...rollers and switching relays follow applicable wiring diagrams for typical low voltage thermostat circuits J INSULATION INSTALLATION Place included fiberglass insulation between and around the water s...

Page 10: ...tank or connected fittings D TEMPERATURE AND PRESSURE RELIEF VALVE Warning Improper installation will present potential hazard to life and property A T P Relief Valve with an 8 inch stem should be use...

Page 11: ...highest hot water faucet Open cold water inlet valve and fill system H WIRING Verify that wiring matches thermostat diagrams Check that water heats to desired temperature I INSTALLATION COMPLETED AND...

Page 12: ...ter faucet and measure the maximum temperature with an accurate thermometer If the temperature is above the safe limits for your circumstances call a service technician to adjust or replace the contro...

Page 13: ...nect all electrical supply to heater Remove cover to Thermostat Adjust right side lever to the desired temperature Moving lever down will decrease temperature See THERMOSTAT DIAGRAM 1 NOTE Markings on...

Page 14: ...stic O ring housing must be properly installed See FIGURE 4 Failure to do this will void the warranty Install and secure the clamp and nut in the following manner o Place the clamp around the flange a...

Page 15: ...vice personnel should check the heater s operations and controls Make certain the water heater is filled before placing it in operation C DRAINING THE HEATER CAUTION Shut off the boiler before drainin...

Page 16: ...15 THERMOSTAT DIAGRAM 1 THERMOSTAT DIAGRAM 2...

Page 17: ...Inserting the probe wires into the press release connector 4 A Position tool on top of white buttons 4 B Push Down on buttons and push wires Down into holes in top of connector This can also be done...

Page 18: ...Relay Panels Some models do not work with Power Stealing thermostats The ETC101 is a power stealing thermostat unless powered separately from the TT terminals as shown in the 3 wire or 4 wire configur...

Page 19: ...r may be used to power the Partner ETC101 limit control 24V terminals in lieu of using a zone relay Connect Partner T T terminals and Partner circulator directly to PureFire DHW Switch terminals and D...

Page 20: ...19 Zoning Panel with HydroStat 3250 Oil Boiler control SR503 shown Zoning Panel with PureFire Boiler SR503 shown...

Page 21: ...20 FIGURE 1 Installation Diagram Using Zone Valves Note PV80 and PV120 have 1 inch HX fittings and 1 1 2 inch hot and cold fittings FIGURE 2 Installation Diagram Using Separate Circulator...

Page 22: ...21 FIGURE 3 Typical Piping Peerless PureFire Boiler...

Page 23: ...22 FIGURE 4...

Page 24: ...he top of the heater for easy installation and access Heat Exchanger Connections Located on the top of the heater for easy installation and access Long Life Heat Exchanger Copper wound finned tubing f...

Page 25: ...PV80 WP0458050429 51376 COIL KIT PARTNER PV120 WP0459050429 2 51377 GASKET KIT PARTNER PV40 60 MS016043 51378 GASKET KIT PARTNER PV80 120 MS016043032 3 51382 V CLAMP PARTNER PV FA0803827000 4 51379 CO...

Page 26: ...vice your heater in the field A qualified installer or service technician must do all service work Therefore if you have any questions about your new water heater concerning service adjustment repair...

Page 27: ...rs only the storage tank for leaks caused by the corrosive effects of water under normal and proper use Recovery under the terms of this agreement is subject to prior approval by the company The tank...

Page 28: ...l provided with the unit and all applicable local and national codes 1 The unit must be operated within the factory calibrated temperature limits and water pressure not exceeding 150 psi 2 Any failure...

Page 29: ...owing information should be noted At time of installation and retained for future reference Model No Serial No Date Installed Dealer s Name Address City State Zip 131 S Church Street Bally PA 19503 Re...

Page 30: ...29 NOTES...

Page 31: ...TALLATION ___________________________________________ Optional Lifetime Warranty on newly purchased tanks Not available on replacement tanks may be purchased by completing and returning this form to P...

Reviews: