Part No. 1101-7119-01 © 2014 PAX Water Technologies, Inc.
PAX Water Mixer (PWM100)
Installation/Operation Manual
9
8. PAX Water Mixer Electrical Checks
The major hazard associated with the PAX Water Mixer is danger of electrical
shock when performing the electrical checks. Always use caution when working
with high voltage.
Following the installation of all hardware, and after all electrical connections have been made,
perform an electrical check and start the PAX Water Mixer, to make sure that PAX Water Mixer is
operating properly. The electrical checks should be completed by a licensed electrical contractor.
Electrical Test Equipment
The following equipment is to be used to perform the electrical check.
• Multimeter
• Current Clamp
NOTE:
Perform the measurements at a location in the circuit where you are able to place a clamp-
on amperage meter and where you can take a voltage reading.
NOTE:
Reference Table 1 for the next steps.
Table 1 Quick Reference Chart
#
WHAT TO MEASURE
READING
MEASURED
NORMAL
READING
MULTIMETER
SYMBOL
TOOL FOR
MEASURING
1
Wire resistance L1 to L2
(when powered down)
1.4 - 2.0 ohms
Ω
Multimeter
(with probes)
2
Wire resistance L1 to Ground and
L2 to Ground (when powered down)
>700K ohms
Ω
Multimeter
(with probes)
3
AC input voltage
110 - 120 VAC
~
Multimeter
(with probes)
4
AC current L1 to L2
9.5 – 11.5 amps
AC
~
Multimeter
(with clamp)