1 Mounting of the insulation [specialist]
8
993xx73x-inf-ml – V01
2017/08
1
Mounting of the insulation [specialist]
Carefully read these instructions before installation and commissioning.
Save these instructions in the vicinity of the installation for future reference.
The chapters called [specialist] are intended for specialists only.
The mounting of the insulation of the HeatBloC K33 must be carried out
in a specific sequence in order to avoid damages of the insulation.
Attention: Connect the pump plug to the pump first.
Another mounting sequence can cause damage to the insulation.
1.
Pass the insulation from below along
the pump cable.
2.
Observe the thermostatic head which
must be lead through the opening of
the insulating shell.