7 Commissioning [specialist]
2017/07
99640141x-mub-en - V02
17
8.
Open a withdrawal point for domestic hot
water (for example a tap) with a flow rate of
at least 10 l/min and let the water run for
about 2 minutes to vent the secondary
circuit. Close all withdrawal points of the
secondary circuit afterwards.
9.
Make sure that the domestic hot water
module is correctly integrated into the
potential equalisation of the installation.
10.
Set the desired domestic hot water
temperature at the controller (see page 20).
11.
The domestic hot water module is now ready
for operation.
Secondary circuit