3 • Installation
Model 4520 & 4110 Series Getting Started Guide
32
Planning the installation
Planning the installation
Before you start the actual installation, it is strongly recommended that you gather all the information needed
to install and setup the device. See
table 5
for an example of what pre-installment checks you might need to
carry out. Having carried out the pre-installation checks enables you to install and set up your gateway router
into an existing infrastructure with confidence.
Note
When setting up your gateway router consider cable length limitations, and
potential electromagnetic interference (EMI) as defined by the applicable
local and international regulations. Ensure that your site is properly prepared
before beginning installation.
Before installing the gateway router device, the following tasks should be completed:
•
Create a network diagram
(see section
“Network information”
on page 34)
•
Gather IP related information
(see section
“IP related information”
on page 34 for more information)
•
Install the hardware and software needed to configure the SmartNode
. (See section
“Software tools”
on
page 34)
•
Verify power source reliability
(see section
“Power source”
on page 34).
When you finish preparing for gateway router installation, go to section
“Installing the gateway router”
on
page 35 to install the device.
Summary of Contents for SMARTNODE 4110 Series
Page 6: ...Contents Model 4520 4110 Series Getting Started Guide 6...
Page 8: ...Compliance information Model 4520 4110 Series Getting Started Guide 8...
Page 14: ...About this guide Model 4520 4110 Series Getting Started Guide 14...
Page 47: ...47 Chapter 5 Monitoring Status Chapter contents Status LEDs 48...
Page 60: ...A Specifications Model 4520 4110 Series Getting Started Guide 60 Power supply...