background image

 

6

 

3.0  INSTALLING THE SHELF

 

The Model 6010 shelf is supplied with mounting brackets and hardware 
to allow installation in a 19 inch or 23 inch rack. By repositioning the 
mounting brackets, the shelf can be installed with the connectors facing 
the front or rear.  With the connectors facing the front, a depth of 10 
inches would be sufficient to mount the shelf with cables installed. 

 

Note

 

See Table 1 on page 5 for rack space requirements for each 

6010 model. 

 

Figure 1. 

 

6010/1U

 

Figure 2. 

 

6010/3U

 

The interconnecting cables shall be acceptable for external use and shall be rated for 
the proper application with respect to voltage, current, anticipated temperature, flam-
mability, and mechanical serviceability.

CAUTION

Summary of Contents for POTS/ISDN Splitter Shelf 6010 Series

Page 1: ...75 1000 TECHNICAL SUPPORT 301 975 1007 Part 07M6010 UM Rev B Revised 11 10 08 An ISO 9001Certi ed Company This is a Class A device and is intended for use in a light industrial environment It is not i...

Page 2: ...3 Safety Compliance 3 1 2 CE Declaration of Conformity 3 1 3 Service 4 1 4 Safety When Working With Electricity 4 2 0 General Information 5 3 0 Installing the Shelf 6 4 0 Grounding the Shelf 8 5 0 Cab...

Page 3: ...damages arising from the use of or inability to use this product Patton Electronics spe ci cally disclaims all other warranties expressed or implied and the installation or use of this product shall b...

Page 4: ...N WORKING WITH ELECTRICITY This device contains no user serviceable parts The equipment shall be returned to Patton Electronics for repairs or repaired by quali ed service personnel Do not work on the...

Page 5: ...comes in four different models Table 1 All models should be installed in a 19 inch or 23 inch rack Table 1 6010 Series Models Model Rack Space 6010 1U Requires 1 75 inches 1U 6010 3U Requires 5 25 in...

Page 6: ...r rear With the connectors facing the front a depth of 10 inches would be suf cient to mount the shelf with cables installed Note See Table 1 on page 5 for rack space requirements for each 6010 model...

Page 7: ...7 Figure 3 6010 4U Figure 4 6010 9U...

Page 8: ...THE SHELF To comply with the Network Equipment Building Systems NEBS requirements a suitable ground must be provided The ground lug on the chassis must be used for the ground wire Figure 5 Grounding...

Page 9: ...6010 splitter shelf using the left most telephone connectors designated DSL interface Signals to and from the LINE outside plant enter the 6010 splitter shelf using the centertelephone connectors des...

Page 10: ...6 7 32 7 32 7 32 7 8 33 8 33 8 33 8 9 34 9 34 9 34 9 10 35 10 35 10 35 10 11 36 11 36 11 36 11 12 37 12 37 12 37 12 13 38 13 38 13 38 13 14 39 14 39 14 39 14 15 40 15 40 15 40 15 16 41 16 41 16 41 16...

Page 11: ..._________________ _________________________________________________________ _________________________________________________________ _________________________________________________________ ________...

Page 12: ...____________________________________________ _________________________________________________________ _________________________________________________________ _______________________________________...

Reviews: