![background image](http://html1.mh-extra.com/html/patton-electronics/onsite-07mos10xx-gs/onsite-07mos10xx-gs_getting-started-manual_4091002030.webp)
OnSite System Installation
30
OnSite Series Getting Started Guide
3 • Installation Overview
Note
Take care to load the rack so that it is not top heavy.
Note
Do not cover vents that would restrict airflow. Leave a minimum of a
half-rack space above and below the OS-10 system for adequate ven-
tilation.
3.
Secure the chassis using four 12-24 x 3/4-inch screws (two screws for each side) through the elongated
holes in the L bracket nearest to the chassis and to the threaded holes in the mounting post. Use a suitable
screwdriver for this task.
4.
Tighten any loose captive installation screws on the expansion slot front panel covers.
Figure 10. Mounting the OS-10 System Chassis in an EIA/TIA 19-Inch Rack
Mounting the Chassis to an ETSI Rack
To install the OS-10 system chassis in an ETSI 300-mm rack, see
Figure 11
and follow these steps:
1.
Install the two L mounting brackets in the orientation shown in
Figure 11
. Insert and fully tighten the
screws to secure the brackets to the chassis (four screws for each bracket). Use a suitable screwdriver for this
task.
Note
For this rack configuration, the L mounting bracket holes are posi-
tioned 50 mm back from the front panel of the OS-10 system, as
shown in
Figure 11
.
2.
Position the chassis in the rack and align the mounting holes in the L bracket with the mounting holes in
the equipment rack.
Note
The mounting-hole pitch for the ETSI 300 mm rack is 25 mm.
Note
Take care to load the rack so that it is not top heavy.