T1/E1 port configuration task list
68
IPLink 2800 Series Getting Started Guide
5 • T1/E1 port configuration
Example 2: Framerelay with a channel-group
port e1t1 0 0
port-type e1
framing crc4
encapsulation channelized
channel-group myGroup
timeslots 13-17
encapsulation hdlc
hdlc
encapsulation framerelay
framerelay
lmi-type itu
pvc 100
encapsulation rfc1490
bind interface pvc100 router
no shutdown
port e1t1 0 0
no shutdown
Example 3: PPP without a channel-group
port e1t1 0 0
port-type e1
framing crc4
encapsulation hdlc
hdlc
encapsulation ppp
bind interface myPPP router
port e1t1 0 0
no shutdown
Example 4: PPP with a channel-group
port e1t1 0 0
port-type e1
framing crc4
encapsulation channelized
channel-group yourGroup
timeslots 1,9,16,23
encapsulation hdlc
hdlc
encapsulation ppp
bind interface myPPP router
port e1t1 0 0
no shutdown
Summary of Contents for IPLink 2821
Page 4: ...Summary Table of Contents IPLink 2800 Series Getting Started Guide 4...
Page 18: ...About this guide IPLink 2800 Series Getting Started Guide 18...
Page 114: ...114 Chapter 9 LEDs status and monitoring Chapter contents Status LEDs 121...
Page 134: ...134 Appendix E IPLink 2800 Series factory configuration Chapter contents Introduction 142...
Page 136: ...136 Appendix F Installation checklist Chapter contents Introduction 144...