Page 1: ...ctions 651 674 2450 info patriotdocks com Scan for Online Help FAQ Online support Rubber Mallet RECOMMENDED TOOLS Cordless Drill Wrenches or sockets M14 or 9 16 M15 or 5 8 Screwdriver Phillips Work Gl...
Page 2: ...n Alum 16 8 Gangway 4 D 10933 Handrail Assembly Pipe Lengths 4 81 5 8 51 16 8 Gangway 4 E 10937 Low Pro Stationary Pipe Holder 16 8 Gangway 8 F 10805 Low Pro Transition Insert 16 Gangway Image not sho...
Page 3: ...le using M10x60mm Bolt Nut TIP Loosely tighten bolts nut Pipe Bracket and Low Pro Transition Inserts 16 Gangway will share bolts nuts 8 Frame Assembly Unwrap shore ramp frame and components Lay out th...
Page 4: ...4 Frame 4 Frame 8 Frame Low Pro Transition Insert connect the 8 and 4 frame together Slide Transition inserts inside Side Tubes and mount with Frame assembly M10x60 bolt nuts Optional Transition plat...
Page 5: ...remaining Handrail Uprights in Low Pro Stationary Pipe Holders Use the remaining 51 Horizontal Handrail Pipes to span the remaining gap between Handrail Uprights The 81 5 and 51 Horizontal Handrail w...
Page 6: ......