2
Install the optional mount cover.
3
Transport the equipment.
1
Detach the main unit from the mount.
When installing the signal light to equipment which is portable, observe the following when moving the equipment.
To ensure safe operation, it is recommended to perform the following:
Disconnect the lead wires.
Main unit
Mount
Inspection Item
Are all the LEDs illuminated?
Are all the buzzer functions sounding?
(For models equipped with the Buzzer
function, only)
Check the outside appearance. Is there any
damage?
Refer to the “ Troubleshooting” section ( P.25) if they do not illuminate.
If there is any external damage such as cracks, or missing parts, stop using
the signal light and replace the necessary parts or the main unit.
(Refer to “ Replacement Parts” ( P.26))
Inspection Repair
Remove the main unit from the mount.
After relocating, remove the mount cover and reinstall the
main unit in its original position.
. Refer to “ Stackable Tower Construction” ( P.18) for
reattaching the main unit to its original position.
. For models with the M12 connector, disconnect the cable
from the main unit.
. Store the mount cover in a safe place after using it.
C
Mount
Mount Cover
(Accessories)
4
11
Refer to the “ Troubleshooting” section ( P.25) if they do not sound.
11
13
24
Tip
Tip
Inspection
10
Post-installation Relocation
9
Summary of Contents for LS7
Page 1: ...2 3 3 4 5 7 9 10 12 13 12 10 11 4 B95100441 H LED 1 2 3 4 5 6 7 8 9 10 12 13 14 11 Model L S 7...
Page 2: ...OK P 10 B FA Factory Automation LED B 10 2 1...
Page 4: ...1 2 P 13 B LED L E D L E D L E D L E D L E D DC24V LS7 F B LED LED 1 4 14 5 4...
Page 5: ...2 3 1 Type1 Enclosure O Type1 Enclosure UL P 13 P 13 B B 5 6...
Page 6: ...4 1 2 5 6 3 5 5 4 2 9 1 4 N m M4 2 M4 M12 P 4 P 9 B B C H P 4 mm 4 4 8 6...
Page 7: ...1 2 1mA A V 1 2 1 PLC 1mA LED LED LED ON OFF ON OFF ON OFF F F B B 7 7...
Page 10: ...2 3 1 LED P 11 P 11 P 12 P 4 M12 C B 4 11 11 13 10 10 9...
Page 14: ...14 4 4 25 Ver 2 0...