BEFORE STARTING ASSEMBLY
REQUIRED TOOLS
CAUTION
Some parts have steel edges. Please be careful when handling components.
Always wear work gloves, eye protection and long sleeves when assembling
or performing any maintenance on your shed. Do not attempt assembly on days
with strong winds or low temperatures.
Remove all of the pieces from the package and spread them out on the ground.
Before installation, please check the type and quantity of parts first.
It is recommended to use a clean work surface to spread the parts out and for
pre-assembly steps. Review all instructions before you begin, continue to refer to
instructions during assembly.
Be sure to follow all steps thoroughly.
Please prepare these components in advance at the beginning of each stage.
03
Requires two people and takes 2-3 hours for Installation.
Recommended to wear gloves to avoid scratches.
Please read the manual carefully before installation.
DO NOT RETURN YOUR UNIT
TO THE STORE
Contact us first
Summary of Contents for T-PS1053S0BNA
Page 4: ...ROOF PARTS P2 X1 P3 X1 S2 X1 M3 X4 M4 X2 GC X4 S3 X1 S4 X1 P1 X2 04...
Page 8: ...Bottom frame 09 10 page Wall 11 18 page Roof 19 21 page Door 22 24 page CONTENTS 08...
Page 9: ...STEP 1 STEP 2 F1 X2 F1 X2 09 BL B1 BL B1 B2 F1 BL B1 F1 BL B2...
Page 12: ...W2A W2A B1 B1 B2 BL BL F1 F1 V2 V2 BR BR STEP 7 STEP 8 12 V2 X4 F1 X4 V2 X3 F1 X3...
Page 15: ...15 B2 B2 B1 V2 X8 F1 X8 STEP 13 STEP 14 V2 X16 F1 X16 W1A F1 V2 W1A W1A L2 L2 L1 L1...
Page 16: ...16 V2 X4 F1 X4 STEP 15 STEP 16 V2 X2 F1 X2 F1 V2 W1A F1 F1 V2 V2 URA URA Tips Internal setup...
Page 21: ...21 V2 X2 F1 X2 STEP 25 STEP 26 M3 M3 M3 M3 V2 V2 GC F1 F1 F5 M3 M3 F5 X4 F5 M3 M4 GC M4 M4...
Page 22: ...22 STEP 27 STEP 28 20 20 DX1 DX1 DR1 DG DL1 20 20...
Page 23: ...V2 X8 F1 X8 F2 X6 V2 X6 F1 X6 23 STEP 29 STEP 30 F1 V2 DG F2 DG F1 20 20 DX1 DX1...
Page 24: ...24 F3 X8 F1 X2 STEP 31 STEP 32 DH DH X2 F3 F3 X8 X2 F3 DF F1...
Page 25: ...V1 X80 STEP 33 FINISH V1 V2 F1 Put it on the screw tip to prevent injury 25...