Step 8.
Place the other side wall on the floor section and use the same
3” star head lags to fasten it.
Step 7.
Fasten the floor section to the side wall using 3” star head lags
through the inside 2x6’s.
Step 6.
Place the floor section on one of the side walls as shown above
then center the wall between the floorboards.
Step 5.
The cargo net should shipped assembled.