Step 7.
Place the 2x6 end piece on the posts.
Position the 2x6 so the pre-drilled holes on the posts and the 2x6
line up.
Step 6.
Flip the posts over so the T-Nuts are on the bottom then line
them up with the pre-drilled holes in the swing beam.
Fasten the 4x4’s to the swing beam using a 6” bolt, washers and a
nut.
Do not tighten this bolt yet.
Step 5.
Place a T-Nut in each pre-drilled hole on the 4x4 posts.
Use a hammer to set them in the wood.
Step 4.
Place two 4x4 posts at the end of the swing beam.